Why Start Run on the HMI: To get Performance and Quality metrics for OEE.
As a best practice, operators should always Start product runs via the HMI before the physical line runs so that you can get accurate Performance and Quality data. The operators should End product run after the line physically ends.
To learn how to start a product run on the HMI, watch the video link at the top of this article.
Product Runs for Cloud Admins (not Operators):
You can add Product Runs after the fact by going to Add Historical Run (top right). If it doesn't have a green line like below the uptime/downtime, that means no Product Run was set.
2. Input Downtime Reasons
When the system detects that the line is down, the screen will go from GREEN (line is up) to ORANGE (line is down). The HMI will automatically prompt the operator to input a downtime reason.
Why Input Downtime Reasons: Provide insight into what is causing the most issues so improvements can be made.
To learn how to input a downtime reason in real-time, watch the video link at the top of this article.
Time Limit: If Operators have 1 hour to enter a reason for a downtime event via the HMI, otherwise it will be reported as "Uncategorized."
Downtime Reasons for Cloud Admins (not Operators):
Add a Downtime Reason in the Dashboard by clicking on the Uncategorized reason, selecting the reason, and hitting save. See below: